Service Charges and Miscellaneous Fees

Effective 10/01/2025

Use the arrows to navigate the table.

Customer Deposit: (per ERC) Water Wastewater Reuse
Initial Deposit $25.00 $50.00 $25.00
Initial Deposit for Customers Without SSN $50.00 $100.00 $50.00

Service Charges and Miscelleaneous Fees:

Use the arrows to navigate the table.

Service Description Fee
After Hours Prepayment for New Service $265.00
Same Day Service Charge and After Hours Premise Visit Surcharge (Normal Hours 8 AM to 5 PM, M–F) $30.00
Initial Connection, Premise Visit Charge, Normal Reconnection, Reconnection due to Repair, and 2nd Trip $30.00
Special Meter Rereads, Hydrant Reading Charge and Backflow Test Final Notice $30.00
Nonpayment Charge Before 4:00 PM, Monday – Friday $30.00
Nonpayment Charge After 4:00 PM and before 9:00 PM, Monday – Friday $95.00
Nonpayment Charge on Weekends and Holidays $127.00
Nonpayment Charge Flat Rate Sewer Account $85.00
Late Notice Charge $3.50
Returned Check Charge $30.00
Hydrant Meter: Application Set Up, Relocation Charge, and Fee to Replace Cut Meter Lock $30.00
Meter Inspection Fee for New Meter Installations $30.00
Meter Testing Charge (5/8"x3/4" & 3/4") (1" & Above Meters: Actual Cost) $74.00
Meter Reset Fee $138.00
Meter Tampering Charge $63.00
Replacement of Broken Curb Stop $85.00
Lien Charge (Charge does not include any recording costs, additional collection fees or attorney fees) $138.00
Violation Reconnection $30.00
Monthly Hydrant Base Charge (plus water at metered rates) $106.00
Hydrant Meter Deposit per Hydrant Policy $585.00 to $1280.00
Hydrant Meter One-Time Fill at CCUA Main Office (plus water at metered rates) $63.00
Waste Disposal Deposit per Septage Haulers Disposal Deposit Policy $63.00
Building Water Monthly Charge All Systems (Un-metered used during construction) $74.00
Wholesale Reclaimed Water Usage Charge Per 1,000 Gallons $0.57
Waste Disposal From Portable Toilets, Septic Tanks, and Landfill Lechate at Sewage Treatment Plant Per 1,000 Gallons $117.00
Processing fees to CCUA for Potable Water (Public Water Supply) Distribution and Transmission System Permits $297.00
Processing fees to CCUA for Domestic Wastewater Collection/Transmission System Permits $297.00
Processing fees to CCUA for Permit Modifications $63.00

Service Availability Charges

Use the arrows to navigate the table.

Service Description Fee
Water Capacity Charge Per ERC $476.93
Alternative Water Supply Charge Per ERC $411.64
SJRWMD Black Creek Water Resource Development Project Connection Charge Per ERC $102.40
Wastewater Connection Charge Per ERC excluding Keystone included in FDEP Grant SG481030 and LP0512 $4,345.34
Reclaimed Water Connection Charge Per ERC For Developments with Reclaimed Water Piping Systems $317.95
Surcharge for Development of Reclaimed Program (Applicable To All Developments That Do Not Install Reclaimed Piping Systems) $410.00
Debt Service Charge per ERC $246.79
Fire Protection ‑ Initial Charge (Per Gallons Per Minute “GPM” Flow) $15.81
Inspection, Plan Review, As-built Drafting, and Recording Fees Actual Cost
Potable Water Meter, with Backflow Device (5/8” x 3/4” Meter with other sizes at cost) Includes Meter Box $501.34
Reclaimed Water Meter (5/8” x 3/4” Meter with other sizes at cost) Developments with Reclaimed Water Piping Systems & Includes Meter Box $435.84
Supplemental Developer Agreement Administrative Charge $100.00
Financed Developer Agreement Administrative Charge $100.00
Flex Space Meter Audit (2nd and subsequent trips) $50.00, + $75.00, per hour in excess of .75 hours per trip See Description
Master Meter Violation Charge, where applicable $500.00
Carrying Charge for Middleburg Service Area Policy and Infill Policy 3.12%
Finance Charge 5.16%
Middleburg Service Area Development Policy – Distribution and Collection Infrastructure Charge Per Acre - Water $5,786.00
Middleburg Service Area Development Policy – Distribution and Collection Infrastructure Charge Per Acre - Wastewater $11,131.00
LAMPA Infrastructure fee per ERC - Potable Water $823.92
LAMPA Infrastructure fee per ERC - Reclaimed Water $1,048.80
LAMPA Infrastructure fee per ERC - Wastewater $1,194.87