HOLIDAY CLOSURE: The CCUA office will be closed Monday, January 19 2026 in observance of Martin Luther King Day. We will resume normal operations on Tuesday, January 20 2026.

If you have a water or wastewater emergency, please call 904-272-5999.

Materials Manual

The Approved Materials Manual provides a list of materials approved for use in the Authority’s systems. Materials in the Manual do not require shop drawing submittals, provided the Contractor Acknowledgement Form and Material Supplier Acknowledgment Form are submitted. Pumps, emergency standby generators and control systems are intentionally omitted and will continue to require shop drawing review and approval. Inquiries regarding specific products, their attributes and the material warranty should be directed to the manufacturer.
Materials Manual Sections

Last Updated: 2/28/2025